UPSC CSE 2017 CSAT · Question 54
UPSC CSE 2017 CSAT question on Time Work Thrice Fast
CSAT is a qualifying paper.
- ExamUPSC CSE - CSAT
- Year2017
- PaperCSAT (General Studies Paper II)
- SubjectBasic numeracy
- TopicTime and work
- DifficultyEasy
P works thrice as fast as Q, whereas P and Q together can work four times as fast as R. If P, Q and R together work on a job, in what ratio should they share the earnings?
Show answer
Answer: A. 3 : 1 : 1
Solution
- Earnings are shared in proportion to the amount of work each person does in the same time, so use their work rates.
- Let Q work at 1 unit per hour. Then P works at 3 units per hour.
- P + Q = 3 + 1 = 4 units per hour. This is four times R’s rate, so R = 4 ÷ 4 = 1 unit per hour.
- Hence their rates, and therefore their earnings, are in the ratio P : Q : R = 3 : 1 : 1.
Why the other options are wrong
- (b) With P : Q = 3 : 2, P would be only 1.5 times as fast as Q, not three times.
- (c) With P : Q = 4 : 3, P would be only 4/3 times as fast as Q.
- (d) If P : Q : R = 3 : 1 : 4, the combined rate of P and Q would equal R rather than four times R.
Quick trick
- Set the slower worker Q’s rate to 1 and scale all other rates from it.
Remember
For equal working time, distribute earnings in proportion to individual work rates.
Hence the answer is (a).
Share
Ask Atlas (5) for similar questions
- Time Work Monday Tuesday — Same work-rate idea: combining individual rates of A, B, C with known completion times.
- Time Work Complete Together — Same pattern: two workers' rates from partial work, then combined working time.
- Time Work Data Inadequate — Same concept: men and women work-equivalence, comparing combined rates for the same job.
- Time Work Certain Complete — Same idea: changing number of workers to alter completion time of a fixed job.
- Time Work Complete Certain — Same rate-based reasoning with fractional work done by X, Y and Z together.
← Full UPSC CSE 2017 CSAT paper · All Basic numeracy questions