UPSC CSE 2025 CSAT · Question 69
UPSC CSE 2025 CSAT question on Time Work Complete Certain
CSAT is a qualifying paper.
- ExamUPSC CSE - CSAT
- Year2025
- PaperCSAT (General Studies Paper II)
- SubjectBasic numeracy
- TopicTime and work
- DifficultyMedium
X can complete one-third of a certain work in 6 days, Y can complete one-third of the same work in 8 days and Z can complete three-fourth of the same work in 12 days. All of them work together for n days and then X and Z quit and Y alone finishes the remaining work in 8⅔ days. What is n equal to?
Show answer
Answer: B. 4
Solution
- Full work alone: X does 1⁄3 in 6 days, so 18 days. Y does 1⁄3 in 8 days, so 24 days. Z does 3⁄4 in 12 days, so 16 days.
- Take total work = LCM(18, 24, 16) = 144 units. Daily rates: X = 8, Y = 6, Z = 9. Together = 23 units per day.
- Y alone finishes in 8⅔ = 26⁄3 days: 6 × 26⁄3 = 52 units.
- Work done by all three = 144 − 52 = 92 units, so n = 92 ÷ 23 = 4 days.
- Check: 4 × 23 + 52 = 92 + 52 = 144 ✓.
Why the other options are wrong
- (a) 3: all three would do 69 units, leaving 75 for Y, i.e. 12.5 days, not 8⅔.
- (c) 5: all three would do 115 units, leaving 29 for Y, i.e. about 4.8 days.
- (d) 6: all three would do 138 units, leaving only 6 for Y, i.e. 1 day.
Quick trick
- Convert to units (144) at once: Y's 8⅔ days = 52 units; the rest, 92, at 23 per day takes 4 days.
Remember
Change partial-work data into full-work days first, then use LCM units to avoid fractions.
Hence the answer is (b).
Share
Ask Atlas (5) for similar questions
- Time Work Data Inadequate — Same work-and-time setup with men and women working together over days.
- Time Work Complete Piece — Multiple workers with individual work rates, finishing a job together under scheduling constraints.
- Time Work Complete Together — Two workers with percentage-of-work rates combined to find completion time.
- Time Work Set Pipes — Combined pipe rates filling a tank with partial fractions and changing set sizes.
- Time Work Completes Job — Fractional work completed in days, then rescaled work amount to find remaining days.
← Full UPSC CSE 2025 CSAT paper · All Basic numeracy questions