UPSC CSE 2024 CSAT · Question 8

UPSC CSE 2024 CSAT question on Time Work Complete Piece

CSAT is a qualifying paper.

X, Y and Z can complete a piece of work individually in 6 hours, 8 hours and 8 hours respectively. However, only one person at a time can work in each hour and nobody can work for two consecutive hours. All are engaged to finish the work. What is the minimum amount of time that they will take to finish the work.

  1. 6 hours 15 minutes
  2. 6 hours 30 minutes
  3. 6 hours 45 minutes
  4. 7 hours
Show answer

Answer: C. 6 hours 45 minutes

Solution

  1. Take total work = LCM(6, 8, 8) = 24 units. Per hour: X does 24 ÷ 6 = 4 units, Y does 3 units, Z does 3 units.
  2. Only one person works in any hour and nobody works two hours in a row. So X, the fastest, can work at most every other hour.
  3. Best order: X, Y, X, Z, X, Y. Work in 6 hours = 4 + 3 + 4 + 3 + 4 + 3 = 21 units. All three are engaged.
  4. Remaining = 24 − 21 = 3 units. The 7th hour can go to X again (Y worked the 6th hour). X needs 3 ÷ 4 hour = 45 minutes.
  5. Total = 6 hours 45 minutes.
  6. Check that 6 hours cannot be beaten: in any 6 hours X can work at most 3 of them, so the most work is 3 × 4 + 3 × 3 = 21 < 24.

Why the other options are wrong

  • (a) 6 hours 15 minutes: after 21 units in 6 hours, 15 minutes of X gives only 1 more unit, 22 in all.
  • (b) 6 hours 30 minutes: 30 minutes of X adds 2 units, 23 in all, still 1 short.
  • (d) 7 hours: work is finished 15 minutes earlier; a full 7th hour of X would do 4 units when only 3 are left.

Quick trick

  • Alternate the fastest worker with the others: every 2 hours give 4 + 3 = 7 units. After 6 hours 21 units are done; finish the last 3 units with X at 4 units/hour, i.e. 45 minutes.

Remember

With "no two consecutive hours" rules, put the fastest worker in every alternate slot, starting with him.

Hence the answer is (c).

Share
Ask Atlas (2) for similar questions
  1. 2023 · Q30 Time Work Monday Tuesday — Same idea: workers take turns on a rotating day-by-day schedule, testing when the work finishes.
  2. 2025 · Q69 Time Work Complete Certain — Same work-rate logic: several workers combined, then one finishes the remainder; tests timing of partial work.

← Full UPSC CSE 2024 CSAT paper · All Basic numeracy questions