A certain number of men can complete a piece of work in 6k days, where k is a natural number. By what percent should the number of men be increased so that the work can be completed in 5k days?
Show answer
Answer: C. 20%
Solution
- Let the number of men be M. Total work = M × 6k man-days.
- To finish in 5k days, men needed = (M × 6k) ÷ 5k = 6M⁄5 = 1.2M.
- Increase = 1.2M − M = 0.2M, which is 0.2 × 100 = 20% of M.
- Check with k = 1 and M = 10: work = 60 man-days. In 5 days, 60 ÷ 5 = 12 men are needed, an increase of 2 on 10, i.e. 20%.
Why the other options are wrong
- (a) 10%: 1.1M men in 5k days do 5.5kM man-days, less than the 6kM needed.
- (b) (50/3)%: this is the 16⅔% fall in days (from 6k to 5k, a drop of k on 6k), not the rise in men.
- (d) 25%: 1.25M men in 5k days do 6.25kM man-days, more than needed.
Quick trick
- Men and days are inversely proportional: days go 6 : 5, so men go 5 : 6, a rise of 1 on 5 = 20%. The k cancels.
Remember
If days fall in the ratio a : b, men must rise in the ratio b : a; percentage rise = (a − b)⁄b × 100.
Hence the answer is (c).
Share
Ask Atlas (4) for similar questions
- Time Work Data Inadequate — Same work-and-men-days relationship; changing men and women counts alters completion time.
- Time Work Completes Job — Same question pattern: change in work quantity or workforce alters required days.
- Time Work Thrice Fast — Same time-and-work ratio reasoning, relating rates of several workers to shares.
- Time Work Set Pipes — Same pipe-and-tank work-rate idea, combining sets with changed numbers of pipes open.
← Full UPSC CSE 2024 CSAT paper · All Basic numeracy questions